Remove the system board assembly

Use this information to remove the system board assembly.

Attention: Removing and installing this component requires trained technicians. Do no attempt to remove or install it without proper training.
Before removing the system board assembly:
  1. Read the following sections to ensure that you work safely.
  2. Record all system configuration information, such as Lenovo XClarity Controller IP addresses, vital product data, and the machine type, model number, serial number, Universally Unique Identifier, and asset tag of the server.

  3. Use the Lenovo XClarity Essentials OneCLI to save the system configuration to external media.

  4. Save the system-event log to external media.

    Note: When replacing the system board assembly, always update the server with the latest firmware or restore the pre-existing firmware. Make sure that you have the latest firmware or a copy of the pre-existing firmware before you proceed.
  5. Turn off the server. Disconnect the power cords and all external cables (see Power off the server).

  6. Remove the node from the enclosure if needed (see Remove a compute node).

  7. Remove the top cover (see Remove the top cover).

To remove the system board assembly, complete the following steps:

Watch the procedure
  • A video of this procedure is available at YouTube.
  1. Remove the following components that are installed on the system board assembly and put them in a safe, static-protective place.
  2. Remove the two screws on the bottom of the server.
    Figure 1. Screws removal
    Screws removal
  3. Remove the three screws on the sides of the server, and remove the two screws that secure VGA connector.
    Figure 2. Screws removal
    Screws removal
  4. Remove the front operator panel by pulling it out from the server.
    Figure 3. Front operator panel removal
    Front operator panel removal
  5. Remove the six screws that secure the LOM package.
    Figure 4. LOM package removal
    LOM package removal
  6. Slightly pull the LOM package forward, and lift it up at an angle as shown to remove it from the server.
    Figure 5. LOM package removal
    LOM package removal
    Note: Wireless enabled LOM package and 10G SFP+ LOM package are removed with the same method.
  7. Remove the eight screws that secure the system board.
    Figure 6. System board removal
    System board removal
  8. Pull the system board forward and lift it up slightly to remove it from the guide pins.
    Figure 7. System board removal
    System board removal
  9. Lift the system board toward the side of the server as shown to remove it from the server.
    Figure 8. System board removal
    System board removal

If you are instructed to return the defective component, please package the part to prevent any shipping damage. Reuse the packaging the new part arrived in and follow all packaging instructions.