You prepare to replace a power canister in a 60-drive controller shelf or drive shelf by collecting support data about your storage array and locating the failed component.
You can replace a power canister while your storage array is powered on and performing host I/O operations, as long as the second power canister in the shelf has an Optimal status and the OK to remove field in the Details area of the Recovery Guru in ThinkSystem System Manager displays Yes.
While you perform this task, the other power canister supplies power to both fans to ensure that the equipment does not overheat.
Go to Remove failed power supply.