If you plan to replace a failed battery, keep the following requirements in mind.
You have installed ThinkSystem Storage Manager on a management station, so you can use the storage array's command line interface (CLI). If this software has not yet been installed, follow the instructions in the Windows express configuration, VMware express configuration, or Linux express configuration to download and install it.