You install a new power canister to replace the failed
one. When you install a power canister, you slide the component into
the shelf, close the cam handle, reconnect the power cord, and reapply
power.
- You have a replacement
power canister that is supported for your controller shelf or drive
shelf model.
- You have checked that
the on/off switch of the new power canister is in the Off position.
- Using both hands,
support and align the edges of the power canister with the opening
in the system chassis, and then gently push the power canister into
the chassis using the cam handle until it locks into place.
Attention: Do not use excessive force when sliding the power
canister into the system; you can damage the connector.
- Close the cam
handle so that the latch clicks into the locked position and the power
canister is fully seated.
- Reconnect the
power cord to the power canister, and secure the power cord to the
power canister using the power cord retainer.
- Turn on the
power to the new power canister.